More work for Workfox

The modification of the gangway of the lifting platform Seafox 7 from Workfox has been completed successfully. Besides performing piping, the installation of lighting and the installation of safety plating we load tested the gangway. During this period we also did the engineering and manufacturing for a stair tower which is used combined with the modernized gangway.