For the large Seafox 5 accommodation platform, ABUCO has built and tested a steel bridge. This 20 meter long bridge was delivered on April 19, 2017. Another bridge project has been carried out by us for the Seafox 2. For this accommodation platform, the connecting bridge is extended by five meters to a total length of 20 meters. For the Seafox 2, we also manufactured a turntable for a gangway this month.