At the end of 2017 Abuco delivered the newest type Walk to Work (W2) system to Ampelmann Operations B.V. For this W2W Abuco fabricated all the steel constructions. The A400-WGW is capable of crossing both people and cargo up to 400kg. This is made possible by an extra wide gangway of 1,2 meter.